Typical assembly (not a tested listing)

4-Hour Fire Rated Concrete Beam — Spray-applied fireproofing

Typical 4-hour fire-rated concrete beam assembly. Post-tensioned concrete beam with Spray-applied fireproofing, 4-hour fire rating. Illustrative example of typical construction — not a tested UL or GA listing. Use a listed design (UL Product iQ or GA-600) for construction documents.

Post-tensioned concrete beam with Spray-applied fireproofing, 4-hour fire rating

The rest of 4-Hour Fire Rated Concrete Beam — Spray-applied fireproofing is for members

You're reading the opening of 4-Hour Fire Rated Concrete Beam — Spray-applied fireproofing. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Layer-by-layer components with thicknesses
  • Cross-section diagram
  • Applicable code sections and test standard
  • 6 related assemblies
Unlock 4-Hour Fire Rated Concrete Beam — Spray-applied fireproofing — free for 14 daysSign in