Typical assembly (not a tested listing)

2-Hour Fire Rated Through-Penetration Firestop — Cementitious System

Typical 2-hour fire-rated through-penetration firestop system. Through-Penetration Firestop, 1-1/2" max width, Cementitious mortar fill. Illustrative example of typical construction — not a tested UL or GA listing. Use a listed design (UL Product iQ or GA-600) for construction documents.

Through-Penetration Firestop, 1-1/2" max width, Cementitious mortar fill

The rest of 2-Hour Fire Rated Through-Penetration Firestop — Cementit… is for members

You're reading the opening of 2-Hour Fire Rated Through-Penetration Firestop — Cementit…. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Layer-by-layer components with thicknesses
  • Cross-section diagram
  • Applicable code sections and test standard
  • 6 related assemblies
Unlock 2-Hour Fire Rated Through-Penetration Firestop — Cementit… — free for 14 daysSign in