Typical assembly (not a tested listing)

3-Hour Fire Rated Wood Truss Roof/Ceiling — 2 layers 5/8" Type X gypsum board

Typical 3-hour fire-rated wood truss roof/ceiling assembly. 2x12 wood rafters at 24" o.c. with R-49 blown cellulose, 2 layers of 5/8" Type X gypsum board ceiling, 5/8" plywood sheathing. Illustrative example of typical construction — not a tested UL or GA listing. Use a listed design (UL Product iQ or GA-600) for construction documents.

2x12 wood rafters at 24" o.c. with R-49 blown cellulose, 2 layers of 5/8" Type X gypsum board ceiling, 5/8" plywood sheathing

The rest of 3-Hour Fire Rated Wood Truss Roof/Ceiling — 2 layers 5/8"… is for members

You're reading the opening of 3-Hour Fire Rated Wood Truss Roof/Ceiling — 2 layers 5/8"…. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Layer-by-layer components with thicknesses
  • Cross-section diagram
  • Applicable code sections and test standard
  • 6 related assemblies
Unlock 3-Hour Fire Rated Wood Truss Roof/Ceiling — 2 layers 5/8"… — free for 14 daysSign in