IBC Design 721.1(3) 5-1.1

4-Hour Fire Rated Reinforced concrete — Slab with suspended ceiling of vermiculite…

IBC Table 721.1(3), Item 5-1.1: Reinforced concrete. Ceiling: Slab with suspended ceiling of vermiculite gypsum plaster over metal lath attached to 3/4" cold-rolled channels spaced 12" on center. Ceiling located 6" minimum below joists. Minimum slab thickness — 4-hr: 3" · 3-hr: 2". Minimum ceiling thickness — 4-hr: 1" · 3-hr: 3/4". Prescriptive assembly from the adopted building code — see table footnotes for conditions.

Reinforced concrete. Ceiling: Slab with suspended ceiling of vermiculite gypsum plaster over metal lath attached to 3/4" cold-rolled channels spaced 12" on center. Ceiling located 6" minimum below joists.

The rest of 4-Hour Fire Rated Reinforced concrete — Slab with suspend… is for members

You're reading the opening of 4-Hour Fire Rated Reinforced concrete — Slab with suspend…. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Layer-by-layer components with thicknesses
  • Cross-section diagram
  • Applicable code sections and test standard
  • 6 related assemblies
Unlock 4-Hour Fire Rated Reinforced concrete — Slab with suspend… — free for 14 daysSign in