FHWA FP-24

Section 152 — Construction Survey and Staking

FP-24 · Division 150 — Project Requirements. Full current text with cross-references on BuildSpec.

Section 152. — CONSTRUCTION SURVEY AND STAKING Description 152.01 This work consists of surveying, staking, calculating, and recording data for the control of work. See FAR Clause 52.236-17 Layout of Work. Construction Requirements 152.02 Qualifications. Provide technically qualified survey crews experienced in highway construction survey and staking. Provide personnel who can perform in a timely and accurate manner. At least 14 days before starting survey and staking work, submit a résumé for each indivi dual. Include the following if AMG methods are used: (a) The name, authority, relevant…

The rest of Section 152 — Construction Survey and Staking is for members

You're reading the opening of Section 152 — Construction Survey and Staking. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 152 — Construction Survey and Staking — free for 14 daysSign in
FP-24 Section 152 — Construction Survey and Staking | BuildSpec