Section 154 — Contractor Sampling and Testing
FP-24 · Division 150 — Project Requirements. Full current text with cross-references on BuildSpec.
Section 154. — CONTRACTOR SAMPLING AND TESTING Description 154.01 This work consists of obtaining samples, testing, and reporting the required test results. It excludes Contractor process and QC sampling and testing required under Section 153. Construction Requirements 154.02 General. Sample and test material according to the Sampling, Testing, and Acceptance Requirements tables included at the end of each Section. Provide testers conforming to Subsection 153.02(d) . Perform additional sampling and testing as directed if material does not meet requirements. Provide the CO the opportunity to…
The rest of Section 154 — Contractor Sampling and Testing is for members
You're reading the opening of Section 154 — Contractor Sampling and Testing. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations