FHWA FP-24
Section 157 — Soil Erosion and Sediment Control
FP-24 · Division 150 — Project Requirements. Full current text with cross-references on BuildSpec.
Section 157. — SOIL EROSION AND SEDIMENT CONTROL Description 157.01 This work consists of providing, constructing, maintaining, and removing soil erosion and sediment control measures to eliminate or minimize pollutants in stormwater discharges from the project. Material 157.02 Conform to the followin g Subsections: Fiber rolls 713.12 Filter rock 705.08 Floating turbidity curtains 713.21 General purpose tackifier 713.11(a) Geote xtile 714.01 Gravel bags 713.13 Mulch 713.05 Nonloadbearing concrete masonry units 725.07(c) Plastic lining 713.22 Prefabricated filter insert 713.20 Rock for riprap…
The rest of Section 157 — Soil Erosion and Sediment Control is for members
You're reading the opening of Section 157 — Soil Erosion and Sediment Control. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations