Section 201 — Clearing and Grubbing

FP-24 · Division 200 — Earthwork. Full current text with cross-references on BuildSpec.

Section 201. — CLEARING AND GRUBBING Description 201.01 This work consists of clearing and grubbing within the clearing limits designated in the plans. Material 201.02 Conform to the following Subsections: Soil and soil- aggregate materials Tree wound dressing 704.01 713.08(g) Construction Requirements 201.03 General. Construct erosion and sediment control measures according to Section 157. Do not start clearing until the limits have been approved. Perform work within approved limits. Where possible, preserve vegetation adjacent to bodies of water. Do not damage vegetation designated to…

The rest of Section 201 — Clearing and Grubbing is for members

You're reading the opening of Section 201 — Clearing and Grubbing. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 201 — Clearing and Grubbing — free for 14 daysSign in
FP-24 Section 201 — Clearing and Grubbing | BuildSpec