FHWA FP-24
Section 203 — Removal of Structures and Obstructions
FP-24 · Division 200 — Earthwork. Full current text with cross-references on BuildSpec.
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS Description 203.01 This work consists of removing, disposing, and salvaging of structures, obstructions, and materials not designated to remain. The work also includes backfilling the trenches, holes, and pits resulting from structure removal. Material 203.02 Conform to the following Subsection: Soil and soil- aggregate materials 704.01 Construction Requirements 203.03 Submittals. At least 30 days before starting the specified work, submit the following according to Subsection 104.06: (a) Bridge removal plan. Submit a plan that includes…
The rest of Section 203 — Removal of Structures and Obstructions is for members
You're reading the opening of Section 203 — Removal of Structures and Obstructions. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations