FHWA FP-24

Section 204 — Excavation and Embankment

FP-24 · Division 200 — Earthwork. Full current text with cross-references on BuildSpec.

Section 204. — EXCAVATION AND EMBANKMENT Description 204.01 This work consists of excavating material and constructing embankments. This work also includes providing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material. 204.02 Definitions. (a) Excavation. Excavation consists of the following: (1) Roadway excavation. Material excavated from within the right- of-way or easement areas, except subexcavation covered in Subsection 204.02(a)(2) and structure excavation covered in Sections 208 and 209. Roadway excavation includes all…

The rest of Section 204 — Excavation and Embankment is for members

You're reading the opening of Section 204 — Excavation and Embankment. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 204 — Excavation and Embankment — free for 14 daysSign in
FP-24 Section 204 — Excavation and Embankment | BuildSpec