FHWA FP-24

Section 208 — Structure Excavation and Backfill for Selected Major Structures

FP-24 · Division 200 — Earthwork. Full current text with cross-references on BuildSpec.

Section 208. — STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED MAJOR STRUCTURES FOR SELECTED MAJOR STRUCTURES Description 208.01 This work consists of excavating material for the construction of selected structures. This work also includes preserving channels, shoring and bracing, constructing cofferdams, sealing foundations, dewatering, preparing foundations, backfilling, and removal of safety features and cofferdams. Material 208.02 Conform to the following Subsections: Neat hydraulic cement grout Soil and soil- aggregate materials 701.04(a) (2) 704.01 Construction Requirements 208.03…

The rest of Section 208 — Structure Excavation and Backfill for Selec… is for members

You're reading the opening of Section 208 — Structure Excavation and Backfill for Selec…. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 208 — Structure Excavation and Backfill for Selec… — free for 14 daysSign in
FP-24 Section 208 — Structure Excavation and Backfill for Selected Major Structures | BuildSpec