FHWA FP-24

Section 209 — Structure Excavation and Backfill

FP-24 · Division 200 — Earthwork. Full current text with cross-references on BuildSpec.

Section 209. — STRUCTURE EXCAVATION AND BACKFILL Description 209.01 This work consists of excavating material for the construction of structures, except those specifically designated under Section 208. This work also includes preserving channels, shoring, and bracing, sealing foundations, dewatering, preparing foundations, bedding, and backfilling. Material 209.02 Conform to the following Subsection: Soil and soil- aggregate materials 704.01 Construction Requirements 209.03 General. Clear the area of vegetation and obstructions according to Sections 201 and 203. Excavate trenches or…

The rest of Section 209 — Structure Excavation and Backfill is for members

You're reading the opening of Section 209 — Structure Excavation and Backfill. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 209 — Structure Excavation and Backfill — free for 14 daysSign in
FP-24 Section 209 — Structure Excavation and Backfill | BuildSpec