FHWA FP-24

Section 211 — Roadway Obliteration

FP-24 · Division 200 — Earthwork. Full current text with cross-references on BuildSpec.

Section 211. — ROADWAY OBLITERATION Description 211.01 This work consists of obliterating or closing roadways and areas outside the roadway prism. Construction Requirements 211.02 Roadway Obliteration Methods. (a) Method 1. Obliterate the roadway by restoring to approximate original ground contours. Keep excavated material within the original construction limits. Finish slopes to provide gradual transitions in slope adjustments without noticeable breaks. (b) Method 2. Close roads by filling ditches and outsloping the roadbed to drain. Remove and slope embankment material at localized…

The rest of Section 211 — Roadway Obliteration is for members

You're reading the opening of Section 211 — Roadway Obliteration. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 211 — Roadway Obliteration — free for 14 daysSign in
FP-24 Section 211 — Roadway Obliteration | BuildSpec