Section 212 — Linear and Site Grading
FP-24 · Division 200 — Earthwork. Full current text with cross-references on BuildSpec.
Section 212. — LINEAR AND SITE GRADING Description 212.01 This work consists of performing linear and site grading at designated locations within specified tolerances. 212.02 Definitions. (a) Linear grading. Consists of constructing and grading roadways on a designated alignment. (b) Site grading. Consists of constructing and grading designated areas outside the roadway prism . Construction Requirements 212.03 Roadway and Site Preparation. Clear the area of vegetation and obstructions according to Sections 201 and 203. 212.04 Excavation and Embankment . Construct the roadbeds and sites…
The rest of Section 212 — Linear and Site Grading is for members
You're reading the opening of Section 212 — Linear and Site Grading. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations