Section 254 — Soldier Pile Retaining Walls
FP-24 · Division 250 — Earth Retaining Systems and Slopes. Full current text with cross-references on BuildSpec.
Section 254. — SOLDIER PILE RETAINING WALLS Description 254.01 This work consists of constructing permanent soldier pile retaining walls. 254.02 Definition. For soldier pile retaining walls, a lift is defined as a stable height of unsupported excavation before installation of lagging. Material 254.03 Conform to the following Section and Subsections: Geocomposite drain Piling Reinforcing steel Welded stud shear connectors 714.02 715 709.01 717.05 Construction Requirements 254.04 Qualifications . Provide an engineer or geologist, a supervisor , and foreperson with experience installing soldier…
The rest of Section 254 — Soldier Pile Retaining Walls is for members
You're reading the opening of Section 254 — Soldier Pile Retaining Walls. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations