FHWA FP-24
Section 255 — Mechanically-Stabilized Earth Walls
FP-24 · Division 250 — Earth Retaining Systems and Slopes. Full current text with cross-references on BuildSpec.
Section 255. — MECHANICALLY-STABILIZED EARTH WALLS Description 255.01 This work consists of constructing MSE walls. Material 255.02 Conform to the following Subsections: Geotextile 714.01 Mechanically -stabilized earth wall material 720.01 Reinforcement geotextile and geogrid 714.04 Select granular backf ill 704.03 Wall facing fill 705.09 Construction Requirements 255.03 General. Survey according to Section 152 and verify the limits of wall installation. Sub mit installation drawings according to Subsection 104.06. Conform to Section 257 for Contractor -designed MSE walls. Do not disturb…
The rest of Section 255 — Mechanically-Stabilized Earth Walls is for members
You're reading the opening of Section 255 — Mechanically-Stabilized Earth Walls. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations