Section 259 — Soil Nail Retaining Walls
FP-24 · Division 250 — Earth Retaining Systems and Slopes. Full current text with cross-references on BuildSpec.
Section 259. — SOIL NAIL RETAINING WALLS Description 259.01 This work consists of constructing soil nail retaining walls. 259.02 Definition. For soil nail retaining walls, a lift is defined as a stable height of unsupported excavation before application of shotcrete, typically midpoint between rows of soil nails. Material 259.03 Conform to the following Subsections: Bolts and nuts 717.01(d) Centralizers and spacers 722.02(e) Geocomposite drain 714.02 Neat hydraulic cement grout 701.04(a) Soil nails 722.04 Soil and soil- aggregate materials 704.01 Structural carbon steel (bearing plates)…
The rest of Section 259 — Soil Nail Retaining Walls is for members
You're reading the opening of Section 259 — Soil Nail Retaining Walls. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations