FHWA FP-24
Section 261 — Reinforced Soil Slopes
FP-24 · Division 250 — Earth Retaining Systems and Slopes. Full current text with cross-references on BuildSpec.
Section 261. — REINFORCED SOIL SLOPES Description 261.01 This work consists of constructing reinforced soil slopes. Material 261.02 Conform to the following Subsections: Crushed aggregate 703.06 Reinforcement geotextile and geogrid 714.04 Soil and soil- aggregate materials 704.01 Wall facing fill 705.09 Wire facin g and backing mat 720.01(b) Construction Requirements 261.03 Submittals. At least 30 days before starting reinforced soil slope work, submit the following according to Subsection 104.06: (a) Manufac turer’s certification. Certification and test results indicating the proposed…
The rest of Section 261 — Reinforced Soil Slopes is for members
You're reading the opening of Section 261 — Reinforced Soil Slopes. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations