FHWA FP-24

Section 261 — Reinforced Soil Slopes

FP-24 · Division 250 — Earth Retaining Systems and Slopes. Full current text with cross-references on BuildSpec.

Section 261. — REINFORCED SOIL SLOPES Description 261.01 This work consists of constructing reinforced soil slopes. Material 261.02 Conform to the following Subsections: Crushed aggregate 703.06 Reinforcement geotextile and geogrid 714.04 Soil and soil- aggregate materials 704.01 Wall facing fill 705.09 Wire facin g and backing mat 720.01(b) Construction Requirements 261.03 Submittals. At least 30 days before starting reinforced soil slope work, submit the following according to Subsection 104.06: (a) Manufac turer’s certification. Certification and test results indicating the proposed…

The rest of Section 261 — Reinforced Soil Slopes is for members

You're reading the opening of Section 261 — Reinforced Soil Slopes. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 261 — Reinforced Soil Slopes — free for 14 daysSign in
FP-24 Section 261 — Reinforced Soil Slopes | BuildSpec