FHWA FP-24

Section 262 — Slope Scaling

FP-24 · Division 250 — Earth Retaining Systems and Slopes. Full current text with cross-references on BuildSpec.

Section 262. — SLOPE SCALING Description 262.01 This work consists of removing and disposing of loose or detached blocks of rock from existing rock slopes and natural rock outcrops by slope scaling. Construction Requirements 262.02 Qualifications. Provide an on- site supervisor and p ersonnel with slope scaling project experience of similar scope and complexity to those shown in the plans and in similar conditions described in the geotechnical or geological reports. A t least 30 days before starting slope scaling work , submit the following for rope supported laborers: (a) Scaling foreperson…

The rest of Section 262 — Slope Scaling is for members

You're reading the opening of Section 262 — Slope Scaling. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 262 — Slope Scaling — free for 14 daysSign in
FP-24 Section 262 — Slope Scaling | BuildSpec