FHWA FP-24
Section 265 — Roadside Rockfall Protection
FP-24 · Division 250 — Earth Retaining Systems and Slopes. Full current text with cross-references on BuildSpec.
Section 265. — ROADSIDE ROCKFALL PROTECTION Description 265.01 This work consists of installing roadside rockfall protection. Construction Requirements 265.02 Qualifications. Provide an on- site supervisor with experience installing gabion barriers and flexible rockfall barrier systems, and drill operators with experience installing ground anchors. A t least 30 days before starting rockfall protection work, submit the following for approval: (a) On-site supervisor. A résumé describing experience on at least fiv e projects installing gabion barriers and flexible rockfall barrier fence systems…
The rest of Section 265 — Roadside Rockfall Protection is for members
You're reading the opening of Section 265 — Roadside Rockfall Protection. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations