Section 267 — Drain Holes in Rock
FP-24 · Division 250 — Earth Retaining Systems and Slopes. Full current text with cross-references on BuildSpec.
Section 267. — DRAIN HOLES IN ROCK Description Material Construction Requirements 267.01 This work consists of constructing unlined and lined drain holes in rock. 267.02 Conform to the following Subsections: 267.03 Qualifications. At least 30 days before starting drain hole in rock work, s ubmit the following for approva l: Lined drain holes in rock 708.06(e) Packaged repair mortar 701.05(b ) Water for cementitious materials 725.01(a) (a) On-site supervisor. A résumé for each on -site supervisor describing at least 2 years’ experience in supervising construction of drain holes in rock of…
The rest of Section 267 — Drain Holes in Rock is for members
You're reading the opening of Section 267 — Drain Holes in Rock. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations