FHWA FP-24

Section 267 — Drain Holes in Rock

FP-24 · Division 250 — Earth Retaining Systems and Slopes. Full current text with cross-references on BuildSpec.

Section 267. — DRAIN HOLES IN ROCK Description Material Construction Requirements 267.01 This work consists of constructing unlined and lined drain holes in rock. 267.02 Conform to the following Subsections: 267.03 Qualifications. At least 30 days before starting drain hole in rock work, s ubmit the following for approva l: Lined drain holes in rock 708.06(e) Packaged repair mortar 701.05(b ) Water for cementitious materials 725.01(a) (a) On-site supervisor. A résumé for each on -site supervisor describing at least 2 years’ experience in supervising construction of drain holes in rock of…

The rest of Section 267 — Drain Holes in Rock is for members

You're reading the opening of Section 267 — Drain Holes in Rock. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 267 — Drain Holes in Rock — free for 14 daysSign in
FP-24 Section 267 — Drain Holes in Rock | BuildSpec