FHWA FP-24

Section 268 — Horizontal Drains

FP-24 · Division 250 — Earth Retaining Systems and Slopes. Full current text with cross-references on BuildSpec.

Section 268. — HORIZONTAL DRAINS Description 268.01 This work consists of constructing horizontal drains, including collector systems. Material 268.02 Conform to the following Subsection: Horizontal drains 708.06(d) Construction Requirements 268.03 Qualifications. Provide an on- site supervisor and installation personnel with experience installing and testing horizonta l drains. A t least 30 days before starting horizontal drain work , submit a résumé for each individual describing their experience on at least five horizontal drain projects of similar complexity within the past 5 years for…

The rest of Section 268 — Horizontal Drains is for members

You're reading the opening of Section 268 — Horizontal Drains. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 268 — Horizontal Drains — free for 14 daysSign in
FP-24 Section 268 — Horizontal Drains | BuildSpec