FHWA FP-24

Section 301 — Untreated Aggregate Courses

FP-24 · Division 300 — Aggregate and Base Courses. Full current text with cross-references on BuildSpec.

Section 301. — UNTREATED AGGREGATE COURSES Description 301.01 This work consists of cons tructing aggregate courses on a prepared surface. Material 301.02 Conform to the following Subsections: Subbase, base, and surface course aggregate 703.05 Water for construction 725.01(c) Construction Requirements 301.03 General. Prepare the surface according to Section 204 or 303 as applicable. After a representative quantity of aggrega te is produced, submit target values within the required gradation range along with a representative 300- pound sample at least 14 days before incorporating the aggregate…

The rest of Section 301 — Untreated Aggregate Courses is for members

You're reading the opening of Section 301 — Untreated Aggregate Courses. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 301 — Untreated Aggregate Courses — free for 14 daysSign in
FP-24 Section 301 — Untreated Aggregate Courses | BuildSpec