FHWA FP-24

Section 304 — Full Depth Reclamation

FP-24 · Division 300 — Aggregate and Base Courses. Full current text with cross-references on BuildSpec.

Section 304. — FULL DEPTH RECLAMATION Description 304.01 This work consists of pulverizing an existing pavement and base in-place, adding crushed aggregate if required, mixing this material with water, and shaping and compacting the mix to produce a base. Material 304.02 Conform to the following Subsections: Crushed aggregate 703.06 Water for construc tion 725.01(c) Construction Requirements 304.03 General. Maintain the existing cross-section or construct to proposed cross-section. Protect manholes, valve covers, and other buried facilities from damage. 304.04 Adding Crushed Aggregate. Add…

The rest of Section 304 — Full Depth Reclamation is for members

You're reading the opening of Section 304 — Full Depth Reclamation. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 304 — Full Depth Reclamation — free for 14 daysSign in
FP-24 Section 304 — Full Depth Reclamation | BuildSpec