Section 305 — Full Depth Reclamation with Cement
FP-24 · Division 300 — Aggregate and Base Courses. Full current text with cross-references on BuildSpec.
Section 305. — FULL DEPTH RECLAMATION WITH CEMENT Description 305.01 This work consists of pulverizing an existing pavement and base in- place, adding crushed aggregate if required, mixing this material with cement and water, and shaping and compacting the mix to produce a stabiliz ed base. Material 305.02 Conform to the following Subsections: Crushed aggregate 703.06 Hydraulic cement 701.01 Water for construction 725.01(c) Construction Requirements 305.03 Proportioning. Collect representative samples of the pavement and base from the project. Process and blend these materials to achieve a…
The rest of Section 305 — Full Depth Reclamation with Cement is for members
You're reading the opening of Section 305 — Full Depth Reclamation with Cement. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations