FHWA FP-24

Section 306 — Full Depth Reclamation with Asphalt

FP-24 · Division 300 — Aggregate and Base Courses. Full current text with cross-references on BuildSpec.

Section 306. — FULL DEPTH RECLAMATION WITH ASPHALT Description 306.01 This work consists of pulverizing an existing pavement and base in- place, adding crushed aggregate if required, mixing this material with emulsified asphalt or foamed asphalt, and shaping and compacting the mix to produce a stabilized base. Material 306.02 Conform to the following Subsections: Asphalt binder 702.01 Crushed aggregate 703.06 Emulsified asphalt 702.02 Fly ash 701.03( a) Portland cement 701.01(a) Water for construction 725.01(c) Construction Requirements 306.03 Proportioning. Collect representative samples of…

The rest of Section 306 — Full Depth Reclamation with Asphalt is for members

You're reading the opening of Section 306 — Full Depth Reclamation with Asphalt. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 306 — Full Depth Reclamation with Asphalt — free for 14 daysSign in
FP-24 Section 306 — Full Depth Reclamation with Asphalt | BuildSpec