FHWA FP-24

Section 308 — Emulsified Asphalt-Treated Base Course

FP-24 · Division 300 — Aggregate and Base Courses. Full current text with cross-references on BuildSpec.

Section 308. — EMULSIFIED ASPHALT-TREATED BASE COURSE Description 308.01 This work consists of constructing a course of emulsified asphalt -treated base on a prepared surface. Material 308.02 Conform to the following Subsections: Emulsified asphalt 702.02 Subbase or base course aggregate 703.05(b) Water for construction 725.01(c) Construction Requirements 308.03 General. Prepare the surface according to Section 204 or 303 as applicable. After a representative quantity of aggregate is produced and at least 14 days before incorporating the aggregate into the work, submit the following: (a)…

The rest of Section 308 — Emulsified Asphalt-Treated Base Course is for members

You're reading the opening of Section 308 — Emulsified Asphalt-Treated Base Course. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 308 — Emulsified Asphalt-Treated Base Course — free for 14 daysSign in
FP-24 Section 308 — Emulsified Asphalt-Treated Base Course | BuildSpec