FHWA FP-24

Section 309 — Cold Central Plant Recycled Asphalt Base Course

FP-24 · Division 300 — Aggregate and Base Courses. Full current text with cross-references on BuildSpec.

Section 309. — COLD CENTRAL PLANT RECYCLED ASPHALT BASE COURSE COURSE Description 309.01 This work consists of constructing one or more courses of cold central plant recycled asphalt base using milled asphalt material. Material 309.02 Conform to the following Subsections: Engineered emulsion 702.02(d) Hydraulic cement 701.01 Lime for asphalt mixtures 725.03(c) Water for construction 725.01(c) Construction Requirements 309.03 Composition of Mix (Job- Mix Formula). Collect representative samples of the recycled asphalt pavement to be used. Reduce oversize particles to no more than 1½ inches.…

The rest of Section 309 — Cold Central Plant Recycled Asphalt Base Co… is for members

You're reading the opening of Section 309 — Cold Central Plant Recycled Asphalt Base Co…. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 309 — Cold Central Plant Recycled Asphalt Base Co… — free for 14 daysSign in