FHWA FP-24

Section 312 — Dust Palliative

FP-24 · Division 300 — Aggregate and Base Courses. Full current text with cross-references on BuildSpec.

Section 312. — DUST PALLIATIVE Description 312.01 This work consists of providing and applying one or more applications of dust palliative on a prepared surface. Material 312.02 Conform to the following Subsections: Calcium chloride, magnesium chloride, and lignosulfonate 725.02 Water for construction 725.01(c) Construction Requirements 312.03 General. Provide equipment for applying, spreading, and processing dust palliative. Make the equipment available for inspection and approval before use. Do not apply dust palliative when precipitation is anticipated within 24 hours of application, or…

The rest of Section 312 — Dust Palliative is for members

You're reading the opening of Section 312 — Dust Palliative. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 312 — Dust Palliative — free for 14 daysSign in
FP-24 Section 312 — Dust Palliative | BuildSpec