FHWA FP-24

Section 313 — Aggregate-Topsoil Course

FP-24 · Division 300 — Aggregate and Base Courses. Full current text with cross-references on BuildSpec.

Section 313. — AGGREGATE-TOPSOIL COURSE Description 313.01 This work consists of providing and placing an aggregate, topsoil, and seed mixture on a prepared shoulder or other surface. Material 313.02 Conform to the following Subsections: Aggregate for aggregate -topsoil course 703.13 Seed 713.04 Topsoil 713.01 Water for construction 725.01(c) Construction Requirements 313.03 Preparing Surface. Complete th e adjoining pavement before placing an aggregate -topsoil course on the shoulder. Scarify the area where the mixture is to be placed to a depth of 3 inches. Reduce clods and sod to a maximum…

The rest of Section 313 — Aggregate-Topsoil Course is for members

You're reading the opening of Section 313 — Aggregate-Topsoil Course. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 313 — Aggregate-Topsoil Course — free for 14 daysSign in
FP-24 Section 313 — Aggregate-Topsoil Course | BuildSpec