FHWA FP-24

Section 409 — Micro Surfacing

FP-24 · Division 400 — Asphalt Pavements and Surface Treatments. Full current text with cross-references on BuildSpec.

Section 409. — MICRO SURFACING Description 409.01 This work consists of applying a polymer- modified micro surfacing mix on a pavement surface. Material 409.02 Conform to the following Subsections: Micro surfacing aggregate 703.10(b) Mineral filler 725.05 Polymer- modified emulsified asphalt for micro surfacing 702.02(b) Water for construction 725.01(c) Construction Requirements 409.03 Qualifications. At least 14 days before starting micro surfacing work , submit a ré sumé for the foreperson describing experience on at least five micro surfacing projects of similar complexity for approval.…

The rest of Section 409 — Micro Surfacing is for members

You're reading the opening of Section 409 — Micro Surfacing. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 409 — Micro Surfacing — free for 14 daysSign in
FP-24 Section 409 — Micro Surfacing | BuildSpec