FHWA FP-24

Section 411 — Asphalt Prime Coat

FP-24 · Division 400 — Asphalt Pavements and Surface Treatments. Full current text with cross-references on BuildSpec.

Section 411. — ASPHALT PRIME COAT Description 411.01 This work consists of applying an asphalt prime coat on a prepared surface. Material 411.02 Conform to the following Subsections: Blotter 703.12 Crushed aggregate 703.06 Emulsified asphalt 702.02 Water for construction 725.01(c) Construction Requirements 411.03 Equipment. Provide equipment conforming to Subsection 407.05. 411.04 Surface Preparation. If applying an asphalt prime coat to an aggregate surface, prepare the surface to be primed according to Subsection 301.06. If required, use sweeping or other approved methods to remove loose…

The rest of Section 411 — Asphalt Prime Coat is for members

You're reading the opening of Section 411 — Asphalt Prime Coat. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 411 — Asphalt Prime Coat — free for 14 daysSign in
FP-24 Section 411 — Asphalt Prime Coat | BuildSpec