FHWA FP-24
Section 551 — Driven Piles
FP-24 · Division 550 — Bridge Construction. Full current text with cross-references on BuildSpec.
Section 551. — DRIVEN PILES Description 551.01 This work consists of providing and constructing driven piles and concrete-filled pipe piles. Material 551.02 Conform to the following Sections and Subsections: Coating material 719 Non-shrink grout 701.04(b)(1) Piling 715 Polyester resin grout 725.14(b) Prestressing steel 709.02 Reinforcing steel 709.01 Sandbags 713.14 Construction Requirements 551.03 Qualifications. Provide a professional engineer and a pile specialty consultant with experience installing driven piles and provide AWS certified welders when installing steel piles. A t least 30…
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations