FHWA FP-24

Section 558 — Dampproofing

FP-24 · Division 550 — Bridge Construction. Full current text with cross-references on BuildSpec.

Section 558. — DAMPPROOFING Description 558.01 This work consists of dampproofing concrete and masonry surfaces. Material 558.02 Conform to the following Subsection: Dampproofing material 723.01 Construction Requirements 558.03 Dampproofing. Cure the concrete or masonry surface according to Subsection 552.13, except do not use liquid membrane curing compound. Allow concrete surface to dry at least 10 days after completion of curing. Apply dampproofing to a dry, clean, and reasonably smooth surface that is free of dust and loose material. Apply dampproofing in dry weather when the air and…

The rest of Section 558 — Dampproofing is for members

You're reading the opening of Section 558 — Dampproofing. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 558 — Dampproofing — free for 14 daysSign in
FP-24 Section 558 — Dampproofing | BuildSpec