FHWA FP-24
Section 559 — Waterproofing and Sealing
FP-24 · Division 550 — Bridge Construction. Full current text with cross-references on BuildSpec.
Section 559. — WATERPROOFING AND SEALING Description 559.01 This work consists of providing and installing waterproofing systems on concrete surfaces and sealing concrete surfaces. Material 559.02 Conform to the following Subsections: Blotter 703.12 Penetrating sealant 725.20 Sealants, fillers, and seals 712.01 Waterproofing material 723.02 Construction Requirements 559.03 Qualifications. At least 30 days before starting waterproofing work, s ubmit the following for approval: (a) Waterproofing sys tems. Provide an on- site supervisor, waterproofing system provider, on- site technical…
The rest of Section 559 — Waterproofing and Sealing is for members
You're reading the opening of Section 559 — Waterproofing and Sealing. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations