FHWA FP-24
Section 560 — Removal of Concrete By Hydrodemolition
FP-24 · Division 550 — Bridge Construction. Full current text with cross-references on BuildSpec.
Section 560. — REMOVAL OF CONCRETE BY HYDRODEMOLITION Description 560.01 This work consists of removing concrete with high- pressure water jets. Material 560.02 Conform to the following Subsection: Water for construction 725.01(c) Construction Requirements 560.03 Submittals. At least 30 days before starting hydrodemolition work, submit the following according to Subsection 104.06: (a) Sequence and schedule of work; (b) Concrete removal procedures; and (c) List of equipment to be used. 560.04 General. Provide water required to operate the hydrodemolition equipment. Protect adjacent property…
The rest of Section 560 — Removal of Concrete By Hydrodemolition is for members
You're reading the opening of Section 560 — Removal of Concrete By Hydrodemolition. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations