FHWA FP-24
Section 561 — Concrete Crack Repair By Epoxy Injection
FP-24 · Division 550 — Bridge Construction. Full current text with cross-references on BuildSpec.
Section 561. — CONCRETE CRACK REPAIR BY EPOXY INJECTION Description 561.01 This work consists of repairing cracks in concrete by injecting epoxy into the cracks. Material 561.02 Conform to the following Subsections: Epoxy resin adhesives 725.12 Latex -modified mortar 701.05(c) Construction Requirements 561.03 General. At least 14 days before starting concrete crack repair work , submit the following according to Subsection 104.06: (a) Person nel qualifications; (b) Manufacturer’s SDS and product data sheets; (c) Manufacturer’s installation recommendations; and (d) Work plan for performing the…
The rest of Section 561 — Concrete Crack Repair By Epoxy Injection is for members
You're reading the opening of Section 561 — Concrete Crack Repair By Epoxy Injection. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations