FHWA FP-24

Section 563 — Coating

FP-24 · Division 550 — Bridge Construction. Full current text with cross-references on BuildSpec.

Section 563. — COATING Description 563.01 This work consists of removing and applying coatings. Material 563.02 Conform to the following Section and Subsection: Coating material 719 Water for cementitious materia ls 725.01(a) Construction Requirements 563.03 Qualifications. At least 30 days before starting coating work, submit the following for approval: (a) Coating contractors . Coating contractors certified according to the following, as appropriate for the work: (1) SSPC -QP1, Certification (Field Application to Complex Industrial and Marine Structures) ; (2) SSPC -QP2, Certification…

The rest of Section 563 — Coating is for members

You're reading the opening of Section 563 — Coating. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 563 — Coating — free for 14 daysSign in
FP-24 Section 563 — Coating | BuildSpec