FHWA FP-24

Section 565 — Drilled Shafts

FP-24 · Division 550 — Bridge Construction. Full current text with cross-references on BuildSpec.

Section 565. — DRILLED SHAFTS Description 565.01 This work consists of providing and constructing reinforced concrete drilled shafts. Material 565.02 Conform to the following Subsections: Neat hydraulic cement grout 701.04(a) (2) Reinforcing steel 709.01 Slurry (d rilling fluids) 725.13 Steel pipes 717.06 Structural carbon steel 717.01(a) Water for cementitious materials 725.01(a) Construction Requirements 565.03 Qualifications. At least 30 days before starting drilled shaft work , submit the following for approval: (a) On-site supervisor. A résu mé for the on-site supervisor describ ing at…

The rest of Section 565 — Drilled Shafts is for members

You're reading the opening of Section 565 — Drilled Shafts. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 565 — Drilled Shafts — free for 14 daysSign in
FP-24 Section 565 — Drilled Shafts | BuildSpec