FHWA FP-24

Section 569 — Concrete Overlays for Bridge Decks

FP-24 · Division 550 — Bridge Construction. Full current text with cross-references on BuildSpec.

Section 569. — CONCRETE OVERLAYS FOR BRIDGE DECKS Description 569.01 This work consists of providing, placing, finishing, and curing concrete for bridge deck overlays. Material 569.02 Conform to the following Section and Subsections: Coarse aggregate for concrete 703.02 Concrete curing material and additives 711 Fine aggregate for concrete 703.01 Hydraulic cement 701.01 Pozzolans 701.03 Water for cementitious materials 725.01(a) Construction Requirements 569.03 Qualifications. Provide an on -site supervisor with experience placing concrete overlays on bridge decks. A t least 30 days before…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in
FP-24 Section 569 — Concrete Overlays for Bridge Decks | BuildSpec