FHWA FP-24
Section 573 — Helical Piles
FP-24 · Division 550 — Bridge Construction. Full current text with cross-references on BuildSpec.
Section 573. — HELICAL PILES Description 573.01 This work consists of designing, providing, and installing helical piles. Material 573.02 Conform to the following Subsection: Helical piles 715.08 Construction Requirements 573.03 Submittals. At least 30 days before starting helical pile work, submit the following according to Subsection 104.06(b)(3) : (a) Product data . Manufacturer’s product data including appurtenances and installation instructions. (b) Drawin gs and calculations. Drawings and calculations complying with the helical pile capacity shown in the plans. At a minimum, include the…
The rest of Section 573 — Helical Piles is for members
You're reading the opening of Section 573 — Helical Piles. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations