FHWA FP-24

Section 574 — Geosynthetic Reinforced Soil-Integrated Bridge System

FP-24 · Division 550 — Bridge Construction. Full current text with cross-references on BuildSpec.

Section 574. — GEOSYNTHETIC REINFORCED SOIL-INTEGRATED BRIDGE SYSTEM SYSTEM Description 574.01 This work consists of constructing geosynthetic reinforced soil -integrated bridge system s (GRS - IBS). Material 574.02 Conform to the following Subsections: GRS reinforcement geosynthetic 714.06 GRS open -graded backfill 703.20 Segmental retaining wall units 720.01(a) Select borrow 704.02 Construction Requirements 574.03 Qualifications. Submit one of the following for approval at least 30 days before starting GRS -IBS work: (a)On-site supervisor and installation personnel . A résumé for each…

The rest of Section 574 — Geosynthetic Reinforced Soil-Integrated Bri… is for members

You're reading the opening of Section 574 — Geosynthetic Reinforced Soil-Integrated Bri…. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 574 — Geosynthetic Reinforced Soil-Integrated Bri… — free for 14 daysSign in
FP-24 Section 574 — Geosynthetic Reinforced Soil-Integrated Bridge System | BuildSpec