FHWA FP-24

Section 575 — Temporary Bridges

FP-24 · Division 550 — Bridge Construction. Full current text with cross-references on BuildSpec.

Section 575. — TEMPORARY BRIDGES Description 575.01 This work consists of designing, constructing, maintaining, and removing temporary bridges. Construction Requirements 575.02 Submittals . Submit drawings and calculations according to Subsection 104.06. Submit detailed drawings showing sizes, arrangement, and quality of materials to be used in the construction. Provide design calculations and supporting data in sufficient detail to allow a structural and safety review of the proposed design. Provide catalog or equivalent data indicating a manufactured device’s recommended safe load capacity.…

The rest of Section 575 — Temporary Bridges is for members

You're reading the opening of Section 575 — Temporary Bridges. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 575 — Temporary Bridges — free for 14 daysSign in
FP-24 Section 575 — Temporary Bridges | BuildSpec