FHWA FP-24
Section 607 — Cleaning, Relaying, and Repairing Existing Drainage Structures
FP-24 · Division 600 — Incidental Construction. Full current text with cross-references on BuildSpec.
Section 607. — CLEANING, RELAYING, AND REPAIRING EXISTING DRAINAGE STRUCTURES REPAIRING EXISTING DRAINAGE STRUCTURES Description 607.01 This work consists of cleaning, relaying, and repairing existing drainage and appurtenant structures. Construction Requirements 607.02 Cleaning Drainage Struc tures in Place. Remove foreign material within the structure and accessories by approved methods. Remove debris, vegetation, and earthen material that impedes inlet and outlet channel flow to the structure. Obtain approval from the CO before removing tree s. Dispose of removed material according to…
The rest of Section 607 — Cleaning, Relaying, and Repairing Existing… is for members
You're reading the opening of Section 607 — Cleaning, Relaying, and Repairing Existing…. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations