FHWA FP-24
Section 611 — Water Systems
FP-24 · Division 600 — Incidental Construction. Full current text with cross-references on BuildSpec.
Section 611. — WATER SYSTEMS Description 611.01 This work consists of constructing or reconstructing water systems. Material 611.02 Conform to the following Subsections: Seamless copper water tube and fittings 707.16 Smooth wall polyethylene pipe 708.01(b) Smooth wall polyvinyl chloride (PVC) pipe 708.06(c) Soil and soil-a ggregate materials 704.01 Steel pipe 717.06 Construction Requirements 611.03 General. Conform to the standards of APWA, AWWA, International Building Code and local agency plumbing and safet y codes. Obtain permits, arrange for inspections, and pay fees necessary to obtain…
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations