FHWA FP-24

Section 614 — Flowable Backfill

FP-24 · Division 600 — Incidental Construction. Full current text with cross-references on BuildSpec.

Section 614. — FLOWABLE BACKFILL Description 614.01 This work consists of constructing flowable backfill of controlled low strength material. Material 614.02 Conform to the following Subsections: Chemical admixtures 711.03 Flowable backfill aggregate 703.15 Hydraulic cement 701.01 Pozzolans 701.03 Water for cementitious materials 725.01(a) Construction Requirements 614.03 Composition of Mix. Design a well -graded, flowable, self -leveling mix. Design a mix with a 7-day compressive strength between 75 and 250 pounds per square inch according to ASTM D4832. Verify the mix design with trial…

The rest of Section 614 — Flowable Backfill is for members

You're reading the opening of Section 614 — Flowable Backfill. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FP-24 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock Section 614 — Flowable Backfill — free for 14 daysSign in
FP-24 Section 614 — Flowable Backfill | BuildSpec