FHWA FP-24
Section 625 — Turf Establishment
FP-24 · Division 600 — Incidental Construction. Full current text with cross-references on BuildSpec.
Section 625. — TURF ESTABLISHMENT Description 625.01 This work consists of soil preparation, watering, fertilizing, seeding, and mulching. Material 625.02 Conform to the following Subsections: Agricultural limestone 713.02 Fertilizer 713.03 Mulch 713.05 Seed 713.04 Tackifiers 713.11 Water for vegetation 725.01(b) Construction Requirements 625.03 General. Within 14 days after completion and approval of finished slopes and ditches, apply turf establishment to those portions of the site. Do not seed during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry,…
The rest of Section 625 — Turf Establishment is for members
You're reading the opening of Section 625 — Turf Establishment. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Full text of every FP-24 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations