49 CFR Part 237

§ 237.5 — Definitions

FRA Part 237 · Subpart A — General. Full current text with cross-references on BuildSpec.

§ 237.5 Definitions. For the purposes of this part— Bridge modification means a change to the configuration of a railroad bridge that affects the load capacity of the bridge. Bridge repair means remediation of damage or deterioration which has affected the structural integrity of a railroad bridge. Railroad bridge means any structure with a deck, regardless of length, which supports one or more railroad tracks, or any other undergrade structure with an individual span length of 10 feet or more located at such a depth that it is affected by live loads. Track owner means a person responsible…

The rest of § 237.5 — Definitions is for members

You're reading the opening of § 237.5 — Definitions. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Full text of every FRA Part 237 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Unlock § 237.5 — Definitions — free for 14 daysSign in
FRA Part 237 237.5 — Definitions | BuildSpec