49 CFR Part 213

§ 213.119 — Continuous welded rail (CWR); plan contents

FRA Part 213 · Subpart D — Track Structure. Full current text with cross-references on BuildSpec.

§ 213.119 Continuous welded rail (CWR); plan contents. The track owner shall comply with the contents of the CWR plan approved or conditionally approved under § 213.118. The plan shall contain the following elements— (a) Procedures for the installation and adjustment of CWR which include— (1) Designation of a desired rail installation temperature range for the geographic area in which the CWR is located; and (2) De-stressing procedures/methods which address proper attainment of the desired rail installation temperature range when adjusting CWR. (b) Rail anchoring or fastening requirements…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Full text of every FRA Part 213 section
  • Search across all federal and state standards in one place
  • Related sections, figures and tables
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in
FRA Part 213 213.119 — Continuous welded rail (CWR); plan contents | BuildSpec