49 CFR Part 213
§ 213.235 — Inspection of switches, track crossings, and lift rail assemblies or other transition devices on moveable bridges
FRA Part 213 · Subpart F — Inspection. Full current text with cross-references on BuildSpec.
§ 213.235 Inspection of switches, track crossings, and lift rail assemblies or other transition devices on moveable bridges. (a) Except as provided in paragraph (c) of this section, each switch, turnout, track crossing, and moveable bridge lift rail assembly or other transition device shall be inspected on foot at least monthly. (b) Each switch in Classes 3 through 5 track that is held in position only by the operating mechanism and one connecting rod shall be operated to all of its positions during one inspection in every 3 month period. (c) In the case of track that is used less than once a…
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- Full text of every FRA Part 213 section
- Search across all federal and state standards in one place
- Related sections, figures and tables
- Ask Copilot about this section, with citations